Live In Play®
Updated: 19-May-21 06:47 ET
VGZ:  Vista Gold announces drill results for step-out drilling at the Mt Todd Gold Project, including a 162 grams of gold per tonne intercept   (1.12)
  • VB21-004 intersected the same structure as VB20-001 and drilled 42 meters @ 0.80 grams gold per ton, including 12 meters @ 1.46 g Au/t.
  • VB21-005 was drilled up-dip from VB21-002 and intersected 29 meters @ 2.65 g Au/t, including 0.31 meters @ 161.80 g Au/t.
  • Both holes confirm the lateral continuity of mineralized structures with drill intercepts 500 meters north of the Batman deposit.
  • VB21-005 confirmed the vertical continuity of the definable high-grade zone intersected in hole VB21-002.
Cookies are essential for making our site work. By using our site, you consent to the use of these cookies. Read our cookie policy to learn more.